The floodstudy was completed in November 2014. The old Catawba River Pump House was converted into a restaurant and required a “No-Rise” floodstudy.
The study was completed in January 2013 for the first free standing Starbucks in Gastonia.
Project was completed in December 2015. Analysis included developing a watershed model and hydraulic model for the dam to evaluate the impacts of a 1/3 PMP flood event.
Project completed in partnership with T.E. Allen Engineering, PC, Rosman, NC. 828-877-4883